Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 80 results ...

Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey, Unpublished PhD Thesis, , Heriot-Watt University.

Akoh, S R (2018) Risk management framework for highway construction projects in Nigeria, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructures and Society, Heriot-Watt University.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads, Unpublished PhD Thesis, , Heriot-Watt University.

Ali Amjad, A (2003) A causal path model to measure the effects of professional training upon time overruns in Saudi construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Alshehri, A R (2016) Quality management system for building maintenance, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness, Unpublished PhD Thesis, , Heriot-Watt University.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects, Unpublished PhD Thesis, School of the Built Environment , Heriot-Watt University.

Auchterlounie, A C (2004) A new quality theory for UK private housebuilding based on definable quality principles, impression management and the control of cognitive dissonance, Unpublished PhD Thesis, , Heriot-Watt University.

Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria, Unpublished PhD Thesis, , Heriot-Watt University.

Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Bageis, A S O (2008) Contractors' decision to bid: development of a bid/no bid strategic decision model, Unpublished PhD Thesis, School of the Built Environment , Heriot-Watt University.

Bausman, D C (2002) An empirical investigation of the relationship between strategic planning and performance of large construction firms, Unpublished PhD Thesis, , Heriot-Watt University.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge, Unpublished PhD Thesis, , Heriot-Watt University.

Bell, K L (1994) The strategic management of projects to enhance value for money for BAA plc, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects, Unpublished PhD Thesis, , Heriot-Watt University.

Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Connelly, J (2001) Developing guidelines for adopting an environmental orientation for construction and related organisations within the supply chain in the construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects, Unpublished PhD Thesis, , Heriot-Watt University.

Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya, Unpublished PhD Thesis, School of Architecture, Heriot-Watt University.

Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK, Unpublished PhD Thesis, , Heriot-Watt University.

Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study, Unpublished PhD Thesis, , Heriot-Watt University.

Falqi, I I A (2011) Knowledge capture and retrieval in construction projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Fortea, S M E (1989) An investigation of appropriateness relative to indigenous and modern housing in Libya, Unpublished PhD Thesis, Department of Architecture, Heriot-Watt University.

Fortune, C J (1999) Factors affecting the selection of building project price forecasting tools, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach, Unpublished PhD Thesis, , Heriot-Watt University.

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity, Unpublished PhD Thesis, , Heriot-Watt University.

Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations, Unpublished PhD Thesis, Schoolof Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Ibrahim, A A R (1995) An empirical analysis of the strategic group concept within the UK construction industry, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations, Unpublished PhD Thesis, , Heriot-Watt University.

Imanghaliyeva, A (2021) Managing sociotechnical risks in infrastructure projects: Sociotechnical Systems (STS) perspectives on systems, Unpublished PhD Thesis, , Heriot-Watt University.

  • Type: Thesis
  • Keywords: failure; collaborative design; risk management; quantitative analysis; case study; infrastructure project; interview
  • ISBN/ISSN:
  • URL: http://hdl.handle.net/10399/4565
  • Abstract:
    As systems become larger, more complex and integrated, the cost of failure increases rapidly, leading to a need for effective risk management tools. However, conventional risk management tools such as the ones based on hazard analysis or accident causation analysis have a narrow focus on either human or technical actors and on single causal chains at one organisational level. This led researchers to introduce the concept of Sociotechnical Systems (STS), involving the interaction of human and non-human technical components. The present study was conducted with the aim of developing ways of applying STS principles and STS-based methods to improve the risk management in large infrastructure projects. Initially, the sets of STS principles for the system design, which had been developed so far, were identified and then integrated and synthesised to produce a list of 20 core STS principles for applying them further in the current study. A comprehensive literature review of the work done in this field since its inception in the 1950s was then conducted, producing a unified list of 103 STS-based methods. These methods were then evaluated for their validity and visibility (occurrence). To identify and analyse major risks in complex infrastructure projects from an STS perspective, an observational case study of a large-scale collaborative design project at Heriot-Watt University was conducted, including running the surveys and interviews with the project participants. The aim was to find out if the presence or absence of the 20 STS principles and 18 associated risk factors affected the performance of the teams. It was found that the team performance was strongly related to the presence or absence of STS principles that was supported by statistically meaningful results of a quantitative analysis. The same STS principles were then applied retrospectively to a second case study, which was the construction of the Edinburgh Tram Network, based on documentary sources and employing the AcciMap and Abstraction Hierarchy (AH) methods. It was concluded that failure to apply these principles and the resulting risks could play a major role in the failure to deliver the project on time and within budget. Finally, a five-phase framework was constructed for STS-based risk management framework of infrastructure projects, with the guideline principles aligning the existing risk management framework with STS theory.

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects, Unpublished PhD Thesis, , Heriot-Watt University.

Khalid, M S (2010) Abandoned housing development: the Malaysian experience, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects, Unpublished PhD Thesis, , Heriot-Watt University.

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Lam, K Y (2017) The role of tacit knowledge in knowledge intensive project management, Unpublished PhD Thesis, , Heriot-Watt University.

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material, Unpublished PhD Thesis, , Heriot-Watt University.

Lim, B T C (1987) Causal modelling construction project performance, Unpublished PhD Thesis, , Heriot-Watt University.

Lockwood, M (1991) A study of national competitive advantage in construction: the European construction industry, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Lonsdale, J H (2011) Falls from height: risk perception of ladder users within the UK construction industry, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Male, S P (1984) A critical investigation of professionalism in quantity surveying, Unpublished PhD Thesis, , Heriot-Watt University.

Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE, Unpublished PhD Thesis, , Heriot-Watt University.

Matshidze, L B (2021) Developing a Public Private Partnerships (PPP) framework for implementing road maintenance projects in South African rural communities, Unpublished PhD Thesis, , Heriot-Watt University.

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process, Unpublished PhD Thesis, , Heriot-Watt University.

Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings, Unpublished PhD Thesis, , Heriot-Watt University.

Mohammed, R E (2007) An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes, Unpublished PhD Thesis, , Heriot-Watt University.

Molwus, J J (2014) Stakeholder management in construction projects: a life cycle based framework, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Murphy, R (2011) Strategic planning in Irish quantity surveying practices, Unpublished PhD Thesis, Edinburgh Business School, Heriot-Watt University.

Omar, N (2022) Enhancing agile application in construction projects using BIM, Unpublished PhD Thesis, , Heriot-Watt University.

Phung, Q A (2020) Project management for sustainable project success, Unpublished PhD Thesis, , Heriot-Watt University.

Preece, C N (1993) A study of the management of promotion for competitive advantage in UK construction firms, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Prince, R F A (2011) The construction briefing process: evaluating the influence of personality traits on the performance of the consultant project manager, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work, Unpublished PhD Thesis, School of Building Engineering and Surveying, Heriot-Watt University.

Salama, M A (2011) The relationship between the performance of the economy and the costing of building projects: a case study of school buildings in Egypt, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Setiawan, H (2015) Corporate entrepreneurship capability model for contractors, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Sharqi, R I A (2017) Developing a system for health and safety enhancement and automation in construction sites, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway, Unpublished PhD Thesis, Edinburgh Business School, Heriot-Watt University.

Sommerville, J (1993) Recruitment sources and employee turnover in sectors of the construction industry, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Strachan, M E (2013) Energy-led, non-domestic building refurbishment: decision support for a whole-building approach to improvement of operational performance, Unpublished PhD Thesis, School of the Built Environment , Heriot-Watt University.

Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects, Unpublished PhD Thesis, , Heriot-Watt University.

Teo, H P (1990) Decision support and risk management system for competitive bidding in refurbishment work, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Teo, R A (2006) Continuous improvement to the construction industry: Enhancing quality through learning, Unpublished PhD Thesis, , Heriot-Watt University.

Wallace, W A (1987) The influence of design team communication content upon the architectural decision making process in the pre-contract design stages, Unpublished PhD Thesis, , Heriot-Watt University.

Werner, J (2012) An investigation of uncertainty dynamics within project management: theoretical and empirical insights, Unpublished PhD Thesis, , Heriot-Watt University.

West, L-J (1982) An investigation into the career choice and occupational perceptions of professional builders and quantity surveyors, Unpublished PhD Thesis, , Heriot-Watt University.

Yatim, Y M (2009) Fire safety models for high-rise residential buildings in Malaysia, Unpublished PhD Thesis, , Heriot-Watt University.

Zulu, S L (2007) The impact of project management process quality on construction project performance: A structural equation model, Unpublished PhD Thesis, , Heriot-Watt University.